DAM AND RESERVOIR
|
![]() |
The
Project reservoir will be formed by the construction of a
39 m high gravity dam with a crest length of 325 m across
the Nam Theun, plus 13 small earthwork saddle dams along the
west bank of the reservoir. A spillway and stilling basin
have
been specially designed for the purpose of reservoir
level control.
The Sponsors and independent consultants
have extensively reviewed the underlying geology of the construction
and reservoir sites. The basic geological structure of the
Project areas is favourable to the undertaking of major civil
works and proper completion and impounding of the reservoir.