| Waterways A 5-km long headrace channel has been excavated in the reservoir floor to direct the stored water to the intake structure. Three kilometres of headrace tunnel, pressure shaft and pressure tunnel transport water from the intake structure to the power station. After passing through the turbines the water enters the Regulating Pond, which has a live storage capacity of 8 million m3, allowing the Project to control releases of water back into the natural river system. The Regulating Dam releases water into a 27-km man-made Downstream Channel, which carries its flow to the Xe Bang Fai River. |

Installed capacity: 1070 MW
6000 GWh of electricity per year
39 m high dam
Operation date: April 2010
A national protected area of 4000 km2
Reservoir capacity: 450 km2
NT2 Success Stories
Nam Theun 2 is recognised as a vehicle for national growth and development in Laos...Click here
Visitor Center
The company endeavours to make information on the Project available to the public and welcomes...Click here
Project Reports
To ensure NT2 is developed with all applicable standards, various monitoring missions are conducted...Click here


